How to require material to be changed by the initiator
Please note that you need to have reviewer access rights to do this. To approve/reject material, follow these steps:
- Locate the specific approval project you would like to approve material for
- Click on the project and a list of all the material in due for approval under this project will appear
- On this page, locate the material you would like to approve/reject from the overview list on the left-hand sidebar and click on it
- As you are previewing the material in the middle of the page, click on the drop-down box in the upper right corner that says ‘pending review’
- In this drop-down box, select either ‘approve’ or ‘reject’ depending on the situation
- You have now either approved or rejected the material
- You can continue approving/rejecting other material by using the navigation bar to the left to select other material